Supply-side intake
Have Power? We Want to Talk.
We acquire, option, lease, and joint venture sites for data center and AI infrastructure development.
You do not need a fully developed data center site. If the land, building, or power is interesting, we can handle the diligence.
What we look for
2 MW+ existing power, credible 5 MW-1 GW+ power paths, industrial properties, brownfields, sites near substations or transmission, natural-gas access, and acreage suitable for behind-the-meter generation.
PropertyPowerStructureContact